GRV Articulated Waler Circular Formwork
With the GRV Articulated waler Circular Formwork, the external ring tension force as well as the internal compression force are transferred by the closed ring of walers.
Consequently, the system allows circular structures to be realized without tie points. This results in substantial savings, for example, the construction of containers, whereby the alternative would be the use of watertight anchor points.
Forming without ties
due to the closed ring of walers
Continuously adjustable
for all internal radii greater than 0.90 m
Versatile in use
for containers or a wide range of arched bridges
MAXIMO Panel Formwork
Developed by PERI, the MX tie technology with one-sided tie installation greatly accelerates formworking operations. At the same time, MAXIMO is significantly faster than conventional panel formwork despite the lower site personnel requirements.
Due to the innovative tie technology and optimized number of tie points, working time values for the system are verifiably up to 50% less. In addition, the centrally-arranged tie points result in a regular joint and tie pattern both horizontally and vertically.
Faster tie installation
through the one-sided tie technology without spacer tubes and cones
Minimum of anchors
through the optimized tie point arrangement
Improved concrete finish
through the neat joint and tie arrangement
SB Brace Frame
SB Brace Frames transfer the fresh concrete pressure into the substructure and foundations during single-sided concreting of structural elements. It can be used with all PERI wall formwork systems.
In addition, SB Brace Frames can be used as horizontal heavy-duty brackets.
Very versatile use
with all PERI wall formwork as well as horizontal heavy-duty brackets
Quickly connected without additional components
as all required connection parts are already mounted on the Brace Frame
Easy to transport
through matching the individual component geometries to suit truck and container dimensions
TRIO Panel Formwork
The focus of the universal TRIO Wall Formwork is on ensuring simple shuttering procedures and reduced shuttering times. Standard panels have only 6 different widths which allow easy handling and efficient logistics. With the BFD Coupler for all connections as well as many other practical system solutions, TRIO has successfully proven itself in countless projects around the world.
TRIO is very versatile and efficient in its use – from residential construction and multi-storey structures through to applications in infrastructure projects. This ensures a high degree of utilisation and thus the cost-effectiveness of the system. Variants of the panel formwork, e.g. the aluminum version or for special surfaces, expands the range of applications.
The closed panel profiles of the TRIO provide high torsional stability. The excellent product quality guarantees a long service life. For all applications, TRIO fulfils the highest requirements regarding the evenness.
Fast working operations
with only a minimum of panel widths as well as panels that can be used both horizontally and vertically
Easy and simple connections
with the BFD Alignment Coupler as the only component for all panel connections
Large-area shuttering
with standard panels up to 3.30 m x 2.40 m – providing a high level of surface evenness and only 2 tie positions
VARIO GT 24 Girder Wall Formwork
With girder wall formwork, the arrangement of the individual system components can be freely selected.
As a result, the VARIO GT 24 can be adapted to suit all geometries and requirements, e.g. tie positions or acceptable fresh concrete pressure.
The system is used as project formwork in residential and industrial construction, bridge abutments and retaining walls as well as in particular for architectural concrete parts.
Adaptable to suit all requirements
through the variable arrangement of formwork girders and walers
Also for architectural concrete executions
due to the freely-selectable tie positioning and joint arrangement in accordance with the planning specifications
Continuous adjustment
through the elongated holes in the walers and couplings with flush, aligned and tight panel connections
FEATURED PROJECTS
Western Construction Group is proud to be involved in some of Western Australia’s largest civil and infrastructure projects