Overview
We were engaged in supporting Altona with their scope of work relating to the upgrade of the highway with additional lanes, new interchanges, bridges and a shared path between Collier Road and Dunreath Drive.
Scope
The scope of our contract included:
- Form, tie steel and place concrete for Head Wall, base and stair cases;
- Form and place concrete for pits; and
- Form, tied steel and place concrete for 50m pipe encasement.
Challenges
During the project execution we were faced with the following site- specific challenges:
- Working parallel and on median strip of Tonkin highway;
- Working in benched excavation; and
- Working near live services.